发明名称 METHOD FOR PREDICTING NATURAL GROUND SITUATION AND METHOD FOR DRILLING TUNNEL
摘要 <P>PROBLEM TO BE SOLVED: To provide methods for predicting natural ground and drilling a tunnel capable of drilling a tunnel by simply predicting natural ground situation ahead of a working face through a daily construction management. <P>SOLUTION: The present invention includes the works of: installing an inclinometer 11, after drilling a tunnel T to a first working face K1, on a top end section of the tunnel with a distance a in a direction from the first working face K1 toward a tunnel entrance side; measuring a first inclination angle &theta;<SB POS="POST">1</SB>at the top end section of the tunnel with the inclinometer 11 after drilling for a distance b ahead of the first work face K1; installing a second inclinometer 12, after drilling to a second working face K2 further ahead of the first work face K1, on the top end section of the tunnel with a distance a in the direction from the second working face K2 toward the tunnel entrance; and measuring a second inclination angle &theta;<SB POS="POST">2</SB>at the top end section of the tunnel with the inclinometer 12 after drilling the distance b ahead of the second work face K2. Then, natural ground situation ahead of the second work face K2 is predicted by comparing the first inclination angle &theta;<SB POS="POST">1</SB>and the second inclination angle &theta;<SB POS="POST">2</SB>. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP2012007408(A) 申请公布日期 2012.01.12
申请号 JP20100145208 申请日期 2010.06.25
申请人 TAISEI CORP 发明人 AOKI TOMOYUKI;SAKAI KAZUO
分类号 E21D9/06;G01C15/00 主分类号 E21D9/06
代理机构 代理人
主权项
地址