发明名称 Scheduling of new job within a start time range based on calculated current load and predicted load value of the new job on media resources
摘要 Method for scheduling a new backup job within a backup application to optimize a utilization of a media resource of said backup application. The backup application includes one or more previously scheduled backup jobs. The backup application calculates a current load of the media resource as a function of the previously scheduled backup jobs and the media resource and predicts a load value for the new backup job as a function of job parameters associated with the new backup job. Then, the backup application schedules the new backup job as a function of the calculated current load and the predicted load value such that the resulting load on the media resource will yield a minimum peak percentage utilization of the media resource. Alternatively, the backup application schedules the new backup job and previously scheduled backup jobs as a function of the calculated current load and the predicted load value such that the resulting load on the media resource will yield a minimum peak percentage utilization of the media resource.
申请公布号 US8091087(B2) 申请公布日期 2012.01.03
申请号 US20070737916 申请日期 2007.04.20
申请人 ALI ABID;MITRA ASIM;MICROSOFT CORPORATION 发明人 ALI ABID;MITRA ASIM
分类号 G06F9/45 主分类号 G06F9/45
代理机构 代理人
主权项
地址