摘要 |
<p>Disclosed is an operation method for a self-propelled mortar vehicle (100), which includes that a basement (300) is laid on a basal layer (200), then a track plate (400) is laid on the basement (300), the self-propelled mortar vehicle (100) crosses over the basement (300) so that wheels (3) of the self-propelled mortar vehicle (100) on both sides are located at the two sides of the basement (300) respectively and travel on the basal layer (200), thereby a track crossing operation is achieved. There is no need to provide a service road in construction for the traveling of the mortar vehicle at the two sides of the track and extra transfer tank or pouring vehicle etc, which provides a convenience for construction.</p> |
申请人 |
CHANGSHA ZOOMLION HEAVY INDUSTRY SCIENCE AND TECHNOLOGY DEVELOPMENT CO., LTD.;HUNAN ZOOMLION SPECIAL VEHICLE CO., LTD.;YU, LIN;YIN, YOUZHONG;ZHU, CHUNCAN;JIANG, YANPING;LIU, HAITAO;DING, YIZHANG;PENG, QIONGMEI;WANG, JUNJIE;DAI, WUXIANG |
发明人 |
YU, LIN;YIN, YOUZHONG;ZHU, CHUNCAN;JIANG, YANPING;LIU, HAITAO;DING, YIZHANG;PENG, QIONGMEI;WANG, JUNJIE;DAI, WUXIANG |