发明名称 SIGNPOST CONNECTING FOUNDATION CONSTRUCTION METHOD
摘要 <P>PROBLEM TO BE SOLVED: To provide a signpost connecting foundation construction method executable in a small space, with generation of very little surplus soil, by an extremely simple work, in a short period, and at low cost. <P>SOLUTION: In constructing a foundation B for connecting a signpost thereon, a vertical hole 10 is constructed by excavating ground G by an excavation device 8. Then, in the vertical hole 10, cement blended soil 12 is produced by mixing an excavated soil and water containing cement. Next, an anchor pile 1, which has tabular pull-out prevention bodies 4, 4.. attached on an outer surface of a pile body 2 in a radial pattern along an axial direction, is placed in the cement blended soil 12. Lastly, the cement blended soil 12 is solidified while keeping the anchor pile 1 in place. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP2011256663(A) 申请公布日期 2011.12.22
申请号 JP20100133937 申请日期 2010.06.11
申请人 UMEOKA MIKIO 发明人 UMEOKA MIKIO
分类号 E01F9/011;E02D27/42;E04H12/22 主分类号 E01F9/011
代理机构 代理人
主权项
地址