摘要 |
FIELD: construction. ^ SUBSTANCE: erection method of building structure consists in the fact that in foundation of framework type there used as collar beam (beam) of framework is a wall of the building. For that purpose, drilling of wells 1 for piles is performed below the freezing level, hollow boxes 2 for pile grouting are installed in the wells, sand is filled and surfaces are levelled with the required accuracy, installation of foundation panels 3 and wall panels 4 on panels 3 is performed. Binding of protruding bars 5 of wall panels 4 and installation of vertical reinforcement 6 into boxes 2 is performed; after that, binding of installed reinforcement 6 with protruding bars 5 of wall panels is performed; then, the cavities formed with hollow boxes for piles and service cavities formed either with edges of wall panels 4 and add-on components, or with cavities made inside wall panels 3 are grouted. ^ EFFECT: reducing time and material costs at erection of building structure using the proposed method. ^ 22 dwg |