A method for erecting a facility for producing electrical energy from wind has the steps of preparing a site to receive the facility, including constructing foundations, and erecting an initial core tower panel and initial peripheral tower sections on their respective foundations. Work platforms and temporary guys are installed so that another core tower panel and other peripheral tower sections may be installed on top of the existing tower sections. The work platforms may then be raised, so that the process may be repeated. Shroud sectors are assembled as needed to form shrouds.
|