发明名称 PROCEDURE FOR ABANDONMENT OF WELL WITH MULTITUDE OF INTERVALS OF PRODUCTION STRING LEAKAGE IN ZONE OF PERMAFROST ROCK
摘要 FIELD: gas and oil production. ^ SUBSTANCE: invention refers to abandonment of operational, exploratory and prospecting holes with multitude of intervals with production string leakage in out-of-the way places in zone of permafrost rock (PFR). At implementation of the procedure the well is killed, a production tree is disassembled to a case of a pipe head whereon there is installed blowout preventor equipment (BPE). A lift string is extracted from the well. Wash pipes are lowered to bottomhole. Cement solution at volume, sufficient for filling annular and tube space of the well, is pumped and pressed into annular space till emergence at a wellhead. Upon completion of a period of waiting for cement hardening (CHW) the BPE is dismantled, cemented in the well wash pipes string is cut off at a level of an upper flange of a tube head case, a transfer reel and central gate are mounted, internal cavities of string, of pipe heads and also of a central gate are filled with cement grout, all side branches and an upper flange of the central gate are sealed with blind flanges and a bench mark is set. ^ EFFECT: raised reliability and ecological safety of gas-oil well abandonment at minimal capital expenditures. ^ 2 dwg
申请公布号 RU2435935(C1) 申请公布日期 2011.12.10
申请号 RU20100126023 申请日期 2010.06.25
申请人 KUSTYSHEV DENIS ALEKSANDROVICH 发明人 KUSTYSHEV DENIS ALEKSANDROVICH;FEDOSEEV ANDREJ PETROVICH;MAGOMEDOVA MISIRINA KUTUEVNA;KUSTYSHEVA SVETLANA ALEKSANDROVNA
分类号 E21B33/13 主分类号 E21B33/13
代理机构 代理人
主权项
地址