发明名称 |
UNDERPASS USING PRECAST CONCRETE PILE AND BOTTOM SLAB AND METHOD FOR CONSTRUCTING THE SAME |
摘要 |
PURPOSE: An underpass using precast concrete piles and a bottom slab and a construction method thereof are provided to prevent damage to a bottom slab by installing shear keys in the whole of a pile body. CONSTITUTION: An underpass using precast concrete piles and a bottom slab comprises wall bodies, a cast-in-place top slab, and a bottom slab. The wall bodies are formed by installing multiple precast concrete piles in a line. The top slab connects the top ends of the wall bodies. The bottom slab is formed by connecting multiple segments(31) to each other along the traveling direction of a vehicle and connects the bottom ends of the wall bodies. |
申请公布号 |
KR20110132910(A) |
申请公布日期 |
2011.12.09 |
申请号 |
KR20100052512 |
申请日期 |
2010.06.03 |
申请人 |
KIM, WON KEUN;LEE, SANG HEON |
发明人 |
KIM, WON KEUN;LEE, SANG HEON;YANG, KU SEUNG |
分类号 |
E02D29/045;E02D5/04 |
主分类号 |
E02D29/045 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|