摘要 |
PURPOSE: A construction method of a standing retaining wall using bracing is provided to secure enough work space without a strut, an earth anchor and ray. CONSTITUTION: A construction method of a standing retaining wall using bracing includes with next. The circumference of an excavation domain is excavated to form an open cut(S100). Multiple soldier piles are approached along both sides of the ground formed by open-cut(S200). The soldier pile and horizontal or vertical slope bracing are interlinked each other in order to form a retaining structure(S300). The excavation domain is excavated in order to form a foundation part(S400). |