发明名称 |
COUPLING PROCESS OF STEEL WIRE FOR SETTING UP OF SCAFFOLD |
摘要 |
PURPOSE: A method of fastening a steel wire to install a scaffold is provided to enable a scaffold plate to be simply installed and detached since there is no need for a welding work to hull. CONSTITUTION: A method of fastening a steel wire to install a scaffold comprises next steps. Two horizontal steel wires(10) subsequently move to the upper part of hull stringer(A). The horizontal steel wires are connected to the hull stringer using a fixing member. A scaffold plate(30) is installed on the upper part of the horizontal steel wires. The upper part(B) of hull is connected to the horizontal steel wires by a vertical steel wire(20), whose one end is connected to the upper part of hull and whose the other end is connected to the horizontal steel wire. The steps of installing the scaffold plate and connecting the upper part of hull to the horizontal steel wire are repeated.
|
申请公布号 |
KR20110127947(A) |
申请公布日期 |
2011.11.28 |
申请号 |
KR20100047492 |
申请日期 |
2010.05.20 |
申请人 |
HAN JIN INDUSTRY AND CONSTRUCTION CO., LTD. |
发明人 |
SON, SANG JU;LEE, JONG KAP;KIM, GWAN HEUNG |
分类号 |
B63B9/06;E04G3/30;E04G21/32 |
主分类号 |
B63B9/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|