发明名称 |
SCHEDULE PARAMETER CORRECTION METHOD AND SCHEDULE CORRECTION DEVICE, SCHEDULE PREPARATION METHOD AND SCHEDULE PREPARATION DEVICE AND STEEL MATERIAL MANUFACTURING METHOD |
摘要 |
<P>PROBLEM TO BE SOLVED: To provide a scheduling parameter correction method capable of efficiently and properly correcting scheduling parameters according to the changes in facilities due to deterioration with time or the like in a manufacturing process (i.e. steel making process) including plural steps and at least one or more bottleneck processes. <P>SOLUTION: The scheduling parameter correction method comprises the steps of: obtaining average value and standard deviation of processing time and conveyance time based on previous operation track data in steel making process; presuming a probability density distribution of time from the calculated average value of time and the standard deviation; calculating expected cost using the probability density distribution; setting parameter correction values so as to minimize the expected cost; and correcting the scheduling parameters using the set parameter correction values. <P>COPYRIGHT: (C)2012,JPO&INPIT |
申请公布号 |
JP2011238003(A) |
申请公布日期 |
2011.11.24 |
申请号 |
JP20100108557 |
申请日期 |
2010.05.10 |
申请人 |
SUMITOMO METAL IND LTD |
发明人 |
AGO MASATOSHI;KITADA HIROSHI;SHIMIZU SHIGEHIRO |
分类号 |
G05B19/418;G06Q50/00;G06Q50/04 |
主分类号 |
G05B19/418 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|