发明名称 PROCEDURE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT
摘要 FIELD: oil and gas production. ^ SUBSTANCE: procedure consists in drilling vertical pressure wells and horizontal producers, in pumping heat carrier through pressure wells, and in withdrawal of production via horizontal producers. A double wellhead horizontal producer is drilled with implementation of one deflector near a bottom of the pay, while a vertical pressure well is drilled positioning bottomhole over a middle part of a horizontal section of the producer at distance avoiding breakthrough of heat carrier. The producer is provisionally divided into several zones with different temperature modes. While pumping heat carrier as far as the pay is being heated and at reaching maximum well product watering, withdrawal is started from a lower, the most heated zone. When temperature of product reaches 80-90 % of breakthrough temperature, withdrawal of product is transferred to zones of lower temperature; zones with high temperature close to breakthrough temperature are insulated with blind packers. If temperature rises in new zones of withdrawal, zones of withdrawal are transferred to colder zones cutting high temperature zones with blind packers. If temperature drops below a required value, zones of withdrawal are transferred to zones of higher temperatures below 70 % of breakthrough temperature. ^ EFFECT: raised oil production rate. ^ 1 dwg, 1 ex
申请公布号 RU2434127(C1) 申请公布日期 2011.11.20
申请号 RU20100117132 申请日期 2010.04.29
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IMENI V.D. SHASHINA 发明人 IBATULLIN RAVIL' RUSTAMOVICH;RAMAZANOV RASHIT GAZNAVIEVICH;IDIJATULLINA ZARINA SALAVATOVNA;OSNOS VLADIMIR BORISOVICH
分类号 E21B43/24 主分类号 E21B43/24
代理机构 代理人
主权项
地址