摘要 |
<P>PROBLEM TO BE SOLVED: To save labor in construction and demolition work while reducing construction cost and decreasing waste materials. <P>SOLUTION: There is provided a timbering implement 10 which supports battens 40 arranged adjacently in parallel in a connected state. The timbering implement 10 has a grip part 110 which grips the battens 40 arranged adjacently together by elastic force and fixedly supports the battens 40 from below and a restraining part 120 which is joined to the grip part 110 and restrains the side faces and upper faces of the battens 40. The restraining part 120 comprises an upper part restraining part 121 which restrains the upper surface side of the structural material 40 and a connection part 122 which connects the upper part restraining part 121 with the grip part 110. In the state of the structural material 40 restrained by the upper part restraining part 121, the grip part 110 is movable between a grip position and a release position regarding to the structural material 40 by rotation around the upper part restraining part 121 as a center shaft. <P>COPYRIGHT: (C)2012,JPO&INPIT |