摘要 |
<P>PROBLEM TO BE SOLVED: To provide a method to completely prevent leakage that occurs when a preventive layer is penetrated, which happens when a conventional foundation member for installing outdoor facilities is used, with respect to a foundation member for installing outdoor facilities. <P>SOLUTION: A foundation member 1 for installing outdoor facilities comprises at least: an bottomed inside cylindrical body 3 that has a flange portion 2a in a lower part and an opening in an upper part; a bottomed outside cylindrical body 4 that is put on the inside cylindrical body so as to close the same; a foundation cylindrical body 6 that is made up by filling shrinkage-compensating mortar 5 into an inner space of the inside cylindrical body and putting on the bottomed outside cylindrical body from an opening side so as to cover the inside cylindrical body; an anchor bolt 9 that is arranged to penetrate the central part of the foundation cylindrical body with the part of the same projected upward; and a projecting portion of the bolt that is implanted to the backing of a roof so as to serve as fixing means for fixing the foundation cylindrical body to the backing of the roof and fix a part of the outdoor facilities on the surface of the foundation cylindrical body. <P>COPYRIGHT: (C)2012,JPO&INPIT |