发明名称 METHOD OF CONSTRUCTION FOR SCOUR PREVENSION AND REINFORCEMENT OF BRIDGE PIER, AND STRUCTURE OF THE SAME
摘要 PURPOSE: Method and structure for reinforcing bridge pier and preventing scour are provided to firmly reinforce bridge pier and a pile without increase in load due to a reinforcing structure and water pollution and remarkably reduce a construction cost and a construction period. CONSTITUTION: A method of reinforcing bridge pier and preventing scour is as follows. Ground is dug to a certain depth. A foundation sack(11) is located on the hole formed due to digging. Dredged sand is filled in the foundation sack. One or more a reinforcing sack(12) filled with the dredged sand are piled on the foundation sack filled with the dredged sand.
申请公布号 KR20110120627(A) 申请公布日期 2011.11.04
申请号 KR20100040114 申请日期 2010.04.29
申请人 NAM, BONG SOO 发明人 NAM, BONG SOO
分类号 E01D22/00;E01D19/02 主分类号 E01D22/00