发明名称
摘要 <P>PROBLEM TO BE SOLVED: To provide a schedule assignment system for assigning operations to each operator for efficiently assigning operations, and for averaging loads on those respective operators even concerning operations whose operation dates are designated or suddenly generated operations. <P>SOLUTION: When an assignment request operation needs operation date to be designated (step 302), and there is not any operator not scheduled on the date (step 303), whether or not there is any movable operation among the already assigned operations on the pertinent date is discriminated (step 304), and the movable operations are moved so that it is possible to efficiently assign operations generated later, and the loads on the respective operators is averaged after schedule assignment (step 308), so that it is possible to average the loads on the respective operators. <P>COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP4799220(B2) 申请公布日期 2011.10.26
申请号 JP20060059302 申请日期 2006.03.06
申请人 发明人
分类号 G06Q10/00;G06Q10/06;G06Q10/10;G06Q50/00 主分类号 G06Q10/00
代理机构 代理人
主权项
地址