摘要 |
<p>A method is proposed for realising a floating work in which a plurality of modules (101) exhibiting a shell (102), defining internally thereof a cavity (103), receive a filter body (104) and are then positioned in water, one flanked to another, such as to define a sector (105) of a floating work. After having provisionally joined the modules while they are in the water, a reinforcing material (106) is dropped, such as reinforced concrete, with the aim of unremovably joining the modules to one another and defining a floor (107) and a predetermined number of beams (108) extending longitudinally along a whole development of the floating work.</p> |