发明名称 |
Clearing blockages in a pipe by blowing air through a duct moved in the same pipe prior to fibre installation |
摘要 |
A method of installing an optical fibre in a pre-installed underground pipe (1) between two locations, process comprising: installing a duct (11) through the underground pipe by: attaching an adaptor (15) to one end of said duct; attaching the other end of said duct to an air compressor (13); blowing air through said sub-duct as it is moved along the length of said underground pipe, the air being blown out of the adaptor at a sufficient pressure so as to dislodge debris (7) within the pipe; and once the sub-duct has traversed the duct, removing the adaptor and blowing the optical fibre along the length of the sub-duct between the two locations.
|
申请公布号 |
EP2372424(A1) |
申请公布日期 |
2011.10.05 |
申请号 |
EP20100250689 |
申请日期 |
2010.03.31 |
申请人 |
BRITISH TELECOMMUNICATIONS PUBLIC LIMITED COMPANY |
发明人 |
|
分类号 |
E21B23/08;G02B6/44;B08B9/032;B08B9/053;F16L55/165;H02G1/08 |
主分类号 |
E21B23/08 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|