摘要 |
FIELD: construction. ^ SUBSTANCE: system of installation of a previous element, then the subsequent element into a base comprises a setting stand with a displacement direction, at least one measuring post installed at the first sign for topographic survey and a unit for direction of the setting stand movements. The method of installation of a previous element, then the subsequent element into the base consists in the fact that at first nominal positions are identified, in which the elements are to be installed into the base, depending on a theoretical trajectory. Then absolute error is determined in position of the previous element relative to the nominal position, into which the previous element is to be installed. Afterwards the setting stand is automatically sent to the assigned position, in which the subsequent element is to be installed, depending on absolute error of positioning determined for the previous element, to reduce the relative error of the subsequent element positioning relative to the previous element. ^ EFFECT: reduced relative error of installed elements positioning. ^ 9 cl, 4 dwg |