摘要 |
A constructed permeability control infrastructure can include a permeability control impoundment, which defines a substantially encapsulated volume. The infrastructure can also include a comminuted hydrocarbonaceous material within the encapsulated volume. The comminuted hydrocarbonaceous material can form a permeable body of hydrocarbonaceous material. The infrastructure can further include at least one convection driving conduit oriented in a lower portion of the permeable body to generate bulk convective flow patterns throughout the permeable body. An associated method of recovering hydrocarbons from hydrocarbonaceous materials can include forming a constructed permeability control infrastructure, which defines a substantially encapsulated volume. A comminuted hydrocarbonaceous material can be introduced into the control infrastructure to form a permeable body of hydrocarbonaceous material. A heated fluid can be passed throughout the permeable body in bulk convective flow patterns to remove hydrocarbons from the permeable body. Removed hydrocarbons can be collected for further processing and/or use. |