发明名称 COMBINED CYCLE POWER PLANT AND METHOD OF OPERATING THE SAME
摘要 PROBLEM TO BE SOLVED: To accurately detect power load unbalance with real operating conditions of a combined cycle power plant. SOLUTION: This combined cycle power plant includes: weighting means 7 and 6 for respectively weighting outputs of a gas turbine and outputs of a steam turbine based on a function corresponding to plant operating conditions; a motor output computing means 4 for computing an output of a turbine motor by adding an output of a gas turbine and an output of a steam turbine, which are respectively weighted by the weighting means 7 and 6, to each other; a power-of-generator computing means 9 for computing power of the generator; and a deviation computing means 10 for computing a deviation between the output of the turbine motor and the power of the generator. When the deviation is a predetermined value or more, an outbreak of power load unbalance is detected. COPYRIGHT: (C)2011,JPO&INPIT
申请公布号 JP2011185106(A) 申请公布日期 2011.09.22
申请号 JP20100048648 申请日期 2010.03.05
申请人 TOSHIBA CORP 发明人 NAKAI SHINJI;TOFUSA MASAYUKI
分类号 F01K23/14;F01K23/10;F01K23/16 主分类号 F01K23/14
代理机构 代理人
主权项
地址