发明名称 Method for construction of sheet pile wall for construction of building-basement, involves filling pit with concrete mixture, and pushing supporting columns into collet after bounding of concrete mixture, where pit is formed in soil
摘要 <p>The method involves setting sheet pile wall pillars as supporting columns (1) and vertically aligning the columns in horizontal distances. A horizontally aligned insertion beam i.e. timber beam (2), is provided between the adjacent columns. A pit is formed in soil adjacent to a level of a basement base plate (4), where a collet (6) is set in the pit and supported against lateral shift. The pit is filled with concrete mixture, and the columns of suitable length are pushed into the collet after bounding of the mixture. A dual-T-profile-steel carrier is used as a dual-steel girder. An independent claim is also included for a device for construction of a sheet pile wall.</p>
申请公布号 DE102010000589(A1) 申请公布日期 2011.09.01
申请号 DE20101000589 申请日期 2010.03.01
申请人 JESICH, AXEL 发明人 JESICH, AXEL
分类号 E02D7/00 主分类号 E02D7/00
代理机构 代理人
主权项
地址