摘要 |
<p>The method involves setting sheet pile wall pillars as supporting columns (1) and vertically aligning the columns in horizontal distances. A horizontally aligned insertion beam i.e. timber beam (2), is provided between the adjacent columns. A pit is formed in soil adjacent to a level of a basement base plate (4), where a collet (6) is set in the pit and supported against lateral shift. The pit is filled with concrete mixture, and the columns of suitable length are pushed into the collet after bounding of the mixture. A dual-T-profile-steel carrier is used as a dual-steel girder. An independent claim is also included for a device for construction of a sheet pile wall.</p> |