摘要 |
FIELD: power engineering. ^ SUBSTANCE: installation consists of heating gas boiler, of cooling aggregate with thermo-regulating valve, also, part of cooling aggregate is separated into a separate unit and is located on external wall of room, while another part of aggregate - evaporator is pressure tight installed inside heating boiler and is connected with offset unit by means of copper pipes. Pipelines with a pump, temperature sensor, expansion tank and batteries are connected to the boiler. ^ EFFECT: avoiding noise in room, reduced output of electric power. ^ 1 dwg |