摘要 |
PURPOSE: An installing method for heavy weight device using multi-transporter is provided to reduce constructing costs of heavy weight device and to keep the surrounding clean by assembling in advance at another place. CONSTITUTION: An installing method for heavy weight device using multi-transporter comprises the next step. The configurations of a second load are assembled in one place to be manufactured into one structure(S101). A multi transporter is installed in the lower part of a stopper(S102). The lower part of the second load is fixed on the top of the multi transporter, and a hydraulic circuit is operated to lift the second load up to a fixed height from the ground(S103). The heavy weight device is transferred to a mounting area with lifted(S104). The operation of the multi transporter is suspended in the installation position of the second load, and the second load is elevated in order to fix to a binding position(S105). The second load and the other structure are connected each other(S106). The installation of the second load is completed. The multi transporter is separated from the second load(S107). |