摘要 |
<p><P>PROBLEM TO BE SOLVED: To dynamically change a schedule in accordance with an operational status of the next step. <P>SOLUTION: A schedule generation system 1 generates a schedule for processing products in a process line having a plurality of steps. Then, the schedule generation system 1 is provided with a first step terminal (a blank control terminal 53). The first step terminal (the blank control terminal 53) is provided with: a monitoring means for monitoring an operational status of the next step; a generation means for generating a schedule of the next step in accordance with the operational status of the next step, which is recognized by the monitoring means; and a process controlling means for controlling the process of the products on the basis of the schedule. <P>COPYRIGHT: (C)2011,JPO&INPIT</p> |