摘要 |
PURPOSE: A construction cost information processing system including construction cost ranking including detail space or part information and method thereof are provided to grasp order of priority or importance of building materials and labor input by grasping quantified ranking of various calculation information according to each detail space or each part. CONSTITUTION: Space selection information about one or more space is obtained about the space that obtains the selection information(Srss11). One or more cost item reference information related to the space is obtained or preset cost item reference information is used(Srss13). According to each cost item standard, the construction cost information according to each low rank space of the space is created(Srss14). Construction cost ranking information according to each low rank space is created(Srss15). |