摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a system and method for startup control of a gas turbine. <P>SOLUTION: The system and method for startup control of the gas turbine includes defining a target startup time for the startup of the gas turbine and determining a remaining time to achieve the target startup time. The system and method includes monitoring at least one parameter associated with the startup and determining a first operating point for the parameter. The system and method adjusts the first operating point for the parameter to a second operating point based at least in part on the remaining time for the startup. The system and method controls an effector based on the second operating point for the parameter. <P>COPYRIGHT: (C)2011,JPO&INPIT</p> |