Method of operating a wind power plant including the steps of: operating the wind power plant at an currentparameter schedule (Pcurrent(v)) performing a wind prediction of wind data (Vw) for a time frame (?T) extending to a future time T, determining a desired fatigue load level (Fdes?red) of a wind power plant component at the future time T, and during operation of said wind power plant generating an updated parameter schedule (Pdes?red(v)) to provide the desired fatigue load level (Fdesired) at time T if exposed to the predicted wind conditions (Vw(t)) during said time frame (?T)
申请公布号
WO2011095519(A2)
申请公布日期
2011.08.11
申请号
WO2011EP51482
申请日期
2011.02.02
申请人
VESTAS WIND SYSTEMS A/S;ZHOU, YU;HERBSLEB, EIK;SPRUCE, CHRIS;HALES, KELVIN