发明名称 FROM FIRST OF ALL EXCAVATION RECLAMATION METHODOF PHC PICKETS WILL IMPROVE AND THE METHOD WILL BE ABLE TO THE METHOD
摘要 <p>PURPOSE: A construction method for improving the supporting force of PHC pile is provided to increase supporting force by minimizing a slime which is the most serious problem. CONSTITUTION: A construction method for improving the supporting force of PHC pile comprises : a step of forming a perforation hole(100) on the location, in which a pile foundation is installed, after removing slime from the lower part of the perforation hole ; a step of inserting a PHC pile in the perforation hole ; a step of punching the bedrock in a fixed depth by using an excavator of small diameter ; a step of installing an air hole on the center of the PHV pile and removing slime ; a step of inserting a pipe the center part of the pipe and injecting cement paste into the center part ; and a step of injecting cement paste into the surrounding the PHC pile.</p>
申请公布号 KR20110087175(A) 申请公布日期 2011.08.02
申请号 KR20100006694 申请日期 2010.01.25
申请人 CM PARTNERS 发明人 SEO, JUNG HO
分类号 E02D7/00;E02D5/58;E02D13/00 主分类号 E02D7/00
代理机构 代理人
主权项
地址