发明名称 DESIGN LOAD ESTIMATING AND OUTPUT METHOD IN CONNECTION WITH MODIFICATION OF THE DESIGN PLANNING CONDITION
摘要 PURPOSE: A method for calculating and estimating a design load by interlinking a changes in schedule of design process according to environment changes in case of ship building are provided to elastically generate distribution chart of hours according to the changed unit even in case of changing a production schedule into a daily basis not a monthly basis. CONSTITUTION: Line information is analyzed. Based on the analyzed line information, a draft of a design plan hours of a new line in a basic information program is written. The draft of hours of design plan is considered and the hours of the design plane is confirmed. The confirmed hours of the design plan and diagram-based ship type hour distribution information are combined to calculate a daily-based design hour plan. A plan for calculated design hours of an existing project and a plan for design hours of a new project are added and a analyzed draft of the design load is written.
申请公布号 KR20110086388(A) 申请公布日期 2011.07.28
申请号 KR20100006098 申请日期 2010.01.22
申请人 STX OFFSHORE & SHIPBUILDING CO., LTD. 发明人 SEO, MOON HO;YOU, DONG KEE;SHIN, IL SUNG;LIM, KEUN MYUNG;JU, SE HOON;CHUNG, HEE SEOK
分类号 G06Q50/04 主分类号 G06Q50/04
代理机构 代理人
主权项
地址