发明名称 Method for starting a turbomachine
摘要 Embodiments of the present invention employ a closed loop controls philosophy, which actively controls the starting means (155) of a powerplant machine (100), throughout the start-up process. Here, the present invention may provide a method (500) for adjusting a nominal operating schedule (515) of the starting means (155), which may have the form of a Load Commutated Inverter (LCI) (155). Embodiments of the method (500) may adjust the nominal operating schedule based (515), in part, on an operating parameter (505), which is associated with the gas turbine 100. The operating parameter (505) may include, but is not limited to: a rotor speed, a desired start-up time, or the like. Here, the control system (150) may receive data on the operating parameter (505) associated with the gas turbine (100).
申请公布号 EP2339128(A2) 申请公布日期 2011.06.29
申请号 EP20100194528 申请日期 2010.12.10
申请人 GENERAL ELECTRIC COMPANY 发明人 SNIDER, DAVID A.;SEELY, WILLIAM F.;MATERS, JOHN C;POST, EUGENE A.;SHARTZER, SAMUEL B.
分类号 F01D19/00;F02C7/26;F02C7/268 主分类号 F01D19/00
代理机构 代理人
主权项
地址