发明名称 CRANE FOR UPPER PART BLOCK PACKAGE INSTALLATION OF WIND POWER PLANT STRUCTURE
摘要 PURPOSE: A crane for the package installation of an upper structure of a wind power plant is provided to vertically position an upper structure and to safely lift up the vertically positioned upper structure even if the height of the upper structure is higher than a boom. CONSTITUTION: A crane for the package installation of an upper structure of a wind power plant comprises lower and upper hydro jacks(26,52), lower and upper guide units(30,54), and a lifting line(20). The lower hydro jack is fixed to a crane cabin structure(16) in a downward inclined state. The upper hydro jack is fixed to the top of a crane boom(14) in an upward inclined state. The lower and upper hydro jacks have rods(24,50). The lower and upper guide units hold the lower and upper parts of an upper structure(28). The lifting line is connected to a lifting ring bracket(78) which lifts up the upper structure.
申请公布号 KR20110072560(A) 申请公布日期 2011.06.29
申请号 KR20090129542 申请日期 2009.12.23
申请人 HYUNDAI HEAVY INDUSTRIES CO., LTD. 发明人 NAM, I HYEON;LEE, SEON SIK;LEE, YOUNG KYOUNG
分类号 B66C1/66;B66C1/62;B66C23/16;B66C23/18 主分类号 B66C1/66
代理机构 代理人
主权项
地址