发明名称 Fremgangsmåde til offshore-installation af en vindturbine
摘要 The process involves lifting auto-lifting platform (10) relative to a sea level and ensuring a fixed position relative to a marine ground. Windmill is moved with a tower (21) in a retracted configuration until a base of the tower in an axis of a pile foundation. The base of the tower is integrated with a top of the pile foundation. The tower is deployed until its configuration is deployed.
申请公布号 DK1581703(T3) 申请公布日期 2011.06.27
申请号 DK20040700466T 申请日期 2004.01.07
申请人 SAIPEM S.A. 发明人 FARGIER, CYRILLE;GOALABRE, JEAN-YVES
分类号 E02B17/00;F03D1/00;F03D11/04 主分类号 E02B17/00
代理机构 代理人
主权项
地址