摘要 |
PROBLEM TO BE SOLVED: To provide a precast concrete skeleton, a building using the same, and a method of construction of the same by which increase in the amount of work is suppressed and the number of construction processes is reduced while maintaining the installation stability even when housing equipment is provided between walls. SOLUTION: The precast concrete skeleton 1 includes a bottom board 2 having a substantially rectangular plate-like shape, and a wall 3, which serves as a wall face, having a substantially rectangular plate-like shape and erected vertically at a substantial center of the bottom board 2. The bottom board 2 has an extension part 2a which is formed in a manner of extending from both side end faces of the wall 3 to secure a space for arranging the housing equipment like a window 51 between the wall and the wall 3 of another precast concrete skeleton 1 when the bottom board 2 is arranged in a manner of abutting on the bottom board 2 of the adjacently arranged precast concrete skeleton 1. Since the bottom board 2 has the extension part 2a, the space can be secured between walls 3 even when the bottom board 2 is arranged in a manner of abutting on another bottom board 2. COPYRIGHT: (C)2011,JPO&INPIT
|