发明名称 TOP-DOWN CONSTRUCTION METHOD BY WHOLE SUPPORT OF RETAINING WALL AND FORM CORRESPONDING TO UNEVEN SURFACE FOR USING IN THE SAME
摘要 PURPOSE: A top-down construction method of an underground structure by supporting the entire surface of a retaining wall and an uneven surface-corresponding mold used in the same are provided to stably support the entire surface of a retaining wall since pillars are continuously constructed along the retaining wall. CONSTITUTION: A top-down construction method of an underground structure by supporting the entire surface of a retaining wall comprises the following steps. A retaining wall and an inner pillar are constructed. The inner ground of the retaining wall is drilled. A first bracket, a support beam, a steel beam, a second bracket are installed. A pillar bottom mold, a deck plate, and an open type earth pressure transfer body are installed. A pillar(520) and a slab(530) are constructed. The steps are repeated, the frame of the underground structure is completed except an underground outer wall.
申请公布号 KR101034853(B1) 申请公布日期 2011.05.17
申请号 KR20110016598 申请日期 2011.02.24
申请人 CM PARTNERS 发明人 SEO, JUNG HO
分类号 E02D29/045;E02D31/00;E04G9/00;E21D13/00 主分类号 E02D29/045
代理机构 代理人
主权项
地址