摘要 |
When test molding is performed by sequentially clamping a mold with a mold clamping force (100%, 80%, 70%, . . .) obtained by sequentially lowering a mold clamping force by a predetermined amount from the maximum mold clamping force (100%), a mold clamping pressure Pc in an injection process is detected and a plurality of different monitored elements (Pc, Pcd and Per) corresponding to the variation of the mold clamping pressure Pc are monitored, and thus it is detected that at least one of the monitored elements is varied to exceed a predetermined threshold, a mold clamping force obtained by increasing a mold clamping force at the time of the production of the variation by a predetermined amount is set as a proper mold clamping force Fs.
|