发明名称 METHOD FOR IMPROVING PERMEABILITY OF BED DURING EXTRACTION OF HIGH-VISCOSITY OIL
摘要 FIELD: oil and gas industry. ^ SUBSTANCE: method involves drilling of vertical well, lowering and cementing of production string with further perforation, lowering of tubing and pump. Prior to sealing of annular space at interval below extraction level in production string there installed is removed blind packer, and on its head a sand bridge is installed. After that, hydraulic fracturing of formation is performed; and after that sand bridge is washed away by lowering process pipe string. Then by means of standard catching tool there removed is blind packer from production string; after that, to production string there lowered and installed between extraction level and level of hydraulic fracturing of formation is packer with through channel. Above level of hydraulic fracturing of formation there installed is additional packer with process pie string, inside which tubing is lowered till there is tight interaction with through channel of packer. ^ EFFECT: reduction of financial and material costs during implementation of method; improvement of permeability of near-roof part of formation. ^ 2 cl, 2 dwg
申请公布号 RU2418162(C1) 申请公布日期 2011.05.10
申请号 RU20100100672 申请日期 2010.01.11
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IMENI V.D. SHASHINA 发明人 IBATULLIN RAVIL' RUSTAMOVICH;RAMAZANOV RASHIT GAZNAVIEVICH;STRAKHOV DMITRIJ VITAL'EVICH;ZIJATDINOV RADIK ZJAUZJATOVICH;OSNOS VLADIMIR BORISOVICH
分类号 E21B43/24 主分类号 E21B43/24
代理机构 代理人
主权项
地址