摘要 |
PROBLEM TO BE SOLVED: To provide an installation temporary construction material of an elevator for shortening assembling time, without requiring readjustment work, by eliminating avoiding work and graduations-converting labor. SOLUTION: This installation temporary construction material of the elevator is provided for installing a support base of a moving work floor on a floor girder when temporarily constructing the elevator. The installing temporary construction material of the elevator includes a winch beam for arranging a cutout not to interfere a piano wire of hanging down to a normal position and supporting the moving work floor, and includes a sliding type corbel for supporting both ends of the winch beam and sliding the winch beam in the longitudinal direction or the lateral direction. COPYRIGHT: (C)2011,JPO&INPIT |