发明名称 TOP-DOWN METHOD USING PRECAST COLUMN AND BUILDING STRUCTURE THEREOF
摘要 PURPOSE: A top-down construction method using a pre-manufactured post and a building structure using the construction method are provided to reduce construction period by simultaneously performing construction under and over the ground. CONSTITUTION: A top-down construction method using a pre-manufactured post is as follows. Ground is punched to form a borehole, into which a pre-manufactured post(100) is inserted. The pre-manufactured post is inserted into the borehole. The inserted post is fixed to cast-in-place pile(150) concrete. The post-inserted ground is excavated. A beam and a slab are installed on a part of the post which is exposed as the ground is excavated.
申请公布号 KR20110043976(A) 申请公布日期 2011.04.28
申请号 KR20090100749 申请日期 2009.10.22
申请人 POSCO ENGINEERING & CONSTRUCTION CO., LTD. 发明人 CHOI, JONG MOON;KAWABATA ICHIZO;KIM, DO HUN;LEE, JONG IN
分类号 E02D29/045;E02D27/12;E21D9/04 主分类号 E02D29/045