发明名称 |
TOP-DOWN METHOD USING PRECAST COLUMN AND BUILDING STRUCTURE THEREOF |
摘要 |
PURPOSE: A top-down construction method using a pre-manufactured post and a building structure using the construction method are provided to reduce construction period by simultaneously performing construction under and over the ground. CONSTITUTION: A top-down construction method using a pre-manufactured post is as follows. Ground is punched to form a borehole, into which a pre-manufactured post(100) is inserted. The pre-manufactured post is inserted into the borehole. The inserted post is fixed to cast-in-place pile(150) concrete. The post-inserted ground is excavated. A beam and a slab are installed on a part of the post which is exposed as the ground is excavated. |
申请公布号 |
KR20110043976(A) |
申请公布日期 |
2011.04.28 |
申请号 |
KR20090100749 |
申请日期 |
2009.10.22 |
申请人 |
POSCO ENGINEERING & CONSTRUCTION CO., LTD. |
发明人 |
CHOI, JONG MOON;KAWABATA ICHIZO;KIM, DO HUN;LEE, JONG IN |
分类号 |
E02D29/045;E02D27/12;E21D9/04 |
主分类号 |
E02D29/045 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|