发明名称 ROUTE CONTROL METHOD, ROUTE CONTROL SYSTEM AND ROUTE CONTROL PROGRAM
摘要 <p><P>PROBLEM TO BE SOLVED: To determine a route of a flow on a network so as to suppress increase of power consumption of the overall network. <P>SOLUTION: In a link definition table 8, for each of links constituting an NW, costs by using the link are defined. When a network status-measuring units 14 detects that any node is in a wake state, a link cost management unit 11 rewrites link costs of all the links flowing into the node with a minute valueδ. When a flow request-receiving unit 13 receives a flow request, a route determining unit 18 determines, as an optimum route, a route minimizing a total sum of costs defined in the table for all the links on a route from among routes that the requested flow may adopt. <P>COPYRIGHT: (C)2011,JPO&INPIT</p>
申请公布号 JP2011077954(A) 申请公布日期 2011.04.14
申请号 JP20090228956 申请日期 2009.09.30
申请人 FUJITSU LTD 发明人 IMAI SATOSHI;YAMADA AKIKO;MATSUNAGA TAKANORI
分类号 H04L12/721;H04L12/725 主分类号 H04L12/721
代理机构 代理人
主权项
地址