发明名称 SCHEDULE ADJUSTMENT PROGRAM, SCHEDULE ADJUSTMENT DEVICE, SCHEDULE ADJUSTMENT METHOD
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a technology of optimizing a schedule of a process containing a plurality of kinds of events. <P>SOLUTION: Normal work information showing a plurality of normal work time zones that are manual work time zones or machine work time zones, having the time lengths and order determined in advance, and specific time information showing at least one specific time zone having the time determined in advance are acquired from a storage part. Combinations of the normal time zones in the normal work information and the specific time zones in the specific time information are successively selected. If there is an overlap between a manual work time zone and a specific time zone as a normal work time zone is determined, the manual work time zone is divided at the start time of the specific time zone, and the start time of the latter one of two divided manual work time zones is changed to the end time of the specific time zone, thereby optimizing the schedule. <P>COPYRIGHT: (C)2011,JPO&INPIT</p>
申请公布号 JP2011065421(A) 申请公布日期 2011.03.31
申请号 JP20090215493 申请日期 2009.09.17
申请人 FUJITSU LTD 发明人 SAKAMOTO FUMIO
分类号 G05B19/418;G06Q50/00;G06Q50/04 主分类号 G05B19/418
代理机构 代理人
主权项
地址
您可能感兴趣的专利