摘要 |
PURPOSE: A landscape facility installation method is provided to reduce the consumption of raw material for the formation of a secondary layer by securing an installation area as a case in advance. CONSTITUTION: A landscape facility installation method is as follows. Excavation is performed to expose an in-situ(100) in target area. Unit blocks are assembled per the designated location of target excavation areas. A case, in which a through hole is formed, is arranged on the in-situ. The addition landscape architecture construction including a secondary layer is performed about the peripheral area around the case. After the addition landscape architecture construction is performed, the case is especially disassembled per unit blocks and drawn out. A fixed block is established in the space in which the case is drawn out. The landscape facility is established on the fixed block. |