发明名称 BRIDGE CONSTRUCTION METHOD USING HYBRID PSC GIRDER
摘要 PURPOSE: A method of constructing a bridge using a hybrid PSC(Pre-stressed Concrete Beam) girder is provided to reduce the weight of the upper and lower structures of a bridge since the horizontal gap of the PSC girder is widely arranged. CONSTITUTION: A method of constructing a bridge using a hybrid PSC girder comprises next steps. A transverse beam(200) is installed between the PSC girder and its side in a transverse direction. A plurality of transverse beams are installed to be separated in a longitudinal direction. A transverse secondary beam(100) is installed between the transverse beams in parallel to the PSC girder(10) in a longitudinal direction. A transverse point(A) is formed on the bottom of a slab by the transverse secondary beam. The slab is formed to make contact with the tops of the PSC girder, the transverse beam, and the transverse secondary beam.
申请公布号 KR20110029300(A) 申请公布日期 2011.03.23
申请号 KR20090086921 申请日期 2009.09.15
申请人 JANG, SUNG HO;EOM, JONG UK;BAE, MUN GYO;UNIT ENGINEERING CO., LTD. 发明人 JANG, SUNG HO;EOM, JONG UK;BAE, MUN GYO
分类号 E01D2/00;E01D21/00 主分类号 E01D2/00
代理机构 代理人
主权项
地址