摘要 |
<P>PROBLEM TO BE SOLVED: To provide a cogeneration system appropriately determining an operating form having an excellent evaluation value. <P>SOLUTION: Based on time-series prediction electric power load and time-series prediction thermal load in a determination target period longer than a cycle of operation determination timing and on heat quantity of hot water stored in a hot water storage tank at the operation determination timing, an operation control means H for controlling the operation of a cogeneration device N determines a first operation time zone having an excellent evaluation value when assuming that the cogeneration device N is operated in a set output condition in the determination target period. In the case where the first operation time zone exists between the operation determination timing and next operation determination timing and where the first evaluation value of the first operation time zone is more excellent than a second evaluation value when the cogeneration device N is stopped in the overall determination target period, the cogeneration device N is operated in the first operation time zone. <P>COPYRIGHT: (C)2011,JPO&INPIT |