摘要 |
PURPOSE: An improved structure and a construction method of a prefabricated curtainwall module consisting of a shock absorber and a connection part are provided to reduce fireproof material costs by installing a connecting part close to a slab. CONSTITUTION: An improved structure comprises a shock absorber(10) and a connection part(20). The shock absorber comprises an enclosure(11), a support tension part, and a cover tension part. The connection part is assembled with the shock absorber to move up and down. The connection part comprises a T-bar(30), a vertical curtain wall bar(31), and an insulating glass. |