摘要 |
PROBLEM TO BE SOLVED: To provide a clamp for suppressing the displacement of a pipe with thrust on the pipe. SOLUTION: A protrusion 58 is provided on an abutment portion 56B of a receiving part 56. The pipe 16 is, therefore, thrust toward the outside via the protrusion 58 while being elastically deformed at the side of the abutment portion 56B. The pipe 16 is clamped between a front end face 54A of an elastic piece 54, a side face 52B of an elastic piece 52, and the receiving part 56, while the pipe 16 is thrust to the side of the elastic piece 52 side (toward an arrowmark A) via the protrusion 58 with elastic energy (resilient force) accumulated by the elastic deformation of the abutment portion 56B. As compared with the case that the receiving part 56 has no elastic energy, the clamping force of clamping the pipe 16 is increased to suppress the displacement of the pipe 16 with thrust on the pipe 16. COPYRIGHT: (C)2011,JPO&INPIT
|