发明名称 HOLD TIME SHORTENING METHOD OF ACTIVATION OF SWITCH OF AUTOMATIC LOAD TRANSFER (ALT) AT TWO-PHASE SHORT CIRCUIT IN ONE OF SECTIONS OF BACKUP LINE
摘要 FIELD: electricity. ^ SUBSTANCE: in the proposed method there controlled are all linear voltages in backup line, loss of one linear voltage in backup line is fixed, and the conclusion is made that two-phase short circuit occurred in backup line; then, loss of all linear voltages in backup line is recorded; after that, maximum hold time of actuation of network automatic reclosure is started to be reckoned. At the same time, the repeated occurrence of two linear voltages is controlled, which is determined with unsuccessful actuation of automatic reclosure to two-phase short circuit; the conclusion is made that two-phase short circuit occurred in backup line and ALT actuation signal is supplied without waiting for maximum hold time of network automatic reclosure. ^ EFFECT: improving accuracy of the method and simplifying its implementation owing to using only linear voltages as controlled parametre. ^ 2 dwg
申请公布号 RU2414038(C1) 申请公布日期 2011.03.10
申请号 RU20100107058 申请日期 2010.02.25
申请人 FEDERAL'NOE GOSUDARSTVENNOE UCHREZHDENIE VYSSHEGOPROFESSIONAL'NOGO OBRAZOVANIJA "ORLOVSKIJ GOSUDARSTVENNYJ AGRARNYJ UNIVERSITET" (FGOU VPO ORELGAU) 发明人 VINOGRADOV ALEKSANDR VLADIMIROVICH;ASTAKHOV SERGEJ MIKHAJLOVICH;SOROKIN NIKOLAJ SERGEEVICH;BAGAEV PAVEL LEONIDOVICH;CHERNYKH NIKOLAJ NIKOLAEVICH
分类号 H02J9/06 主分类号 H02J9/06
代理机构 代理人
主权项
地址