发明名称 MECHANICAL POWER TRANSMISSION SYSTEM FOR TESTING FULL-SCALE COMPRESSOR RIG AND GAS TURBINE
摘要 PROBLEM TO BE SOLVED: To provide a mechanical power transmission system assembly for testing a full-scale compressor rig and a gas turbine. SOLUTION: The power transmission system 100 includes an electric motor 120, a gear box 140, and the gas turbine 160. A compressor rig 150 is connected to the power transmission system 100 between the electric motor 120 and the gas turbine 160. The power transmission system 100 further includes a torque converter 130 transmitting torque from the electric motor 120 to the compressor rig 150. The power transmission system 100 is constituted to test the full-scale compressor rig 150 in a whole rate and load operation range and allows full compressor mapping from choke to stall, under a full load condition, a partial load (output turndown) condition, and a partial rate condition. COPYRIGHT: (C)2011,JPO&INPIT
申请公布号 JP2011047404(A) 申请公布日期 2011.03.10
申请号 JP20100187748 申请日期 2010.08.25
申请人 GENERAL ELECTRIC CO 发明人 HANSEN CHRISTIAN MICHAEL;MOODY DOUGLAS GILES;MINTO KARL DEAN
分类号 F01D25/00;F02C7/00;F02C7/36;F04B51/00 主分类号 F01D25/00
代理机构 代理人
主权项
地址