发明名称 CONSTRUCTION METHOD OF CAST-IN-PLACE CONCRETE PILE OR CYLINDRICAL SOIL IMPROVING BODY
摘要 PROBLEM TO BE SOLVED: To provide a construction method for downsizing a pile by introducing prestress to a cast-in-place concrete pile, and also for downsizing and simplifying a construction device. SOLUTION: An anchoring steel rod 1 is inserted from the ground surface 101 into the ground 100, and an anchoring part 2 is arranged to anchor a lower end of the anchoring steel rod 1 in the supporting ground. Then, a cast-in-place concrete pile hole 10 is drilled around the anchoring steel rod 1, and concrete is placed in the pile hole 10 to construct the cast-in-place concrete pile 20. After that, a bearing plate 4 is placed on an upper surface of the concrete pile 20, and then the anchoring steel rod 1 is tensioned to introduce a compression stress to the cast-in-place concrete pile 20. COPYRIGHT: (C)2011,JPO&INPIT
申请公布号 JP2011047202(A) 申请公布日期 2011.03.10
申请号 JP20090197023 申请日期 2009.08.27
申请人 RYOKEN KISO CO LTD 发明人 OGITA SHIGEYA
分类号 E02D5/34;E02D3/12;E02D5/80 主分类号 E02D5/34
代理机构 代理人
主权项
地址