COST CALCULATING METHOD FOR RIVER EMBANKMENT FACILITY CONSTRUCTION |
摘要 |
PURPOSE: A construction cost calculating method of a river facility construction is provided to enhance an accuracy of summary construction cost calculation by systematically and scientifically calculating a summary construction cost of river facility construction. CONSTITUTION: A large work section is classified into various types. By using different methods, the construction costs of the large work section are calculated. By adding the calculated construction cost of a large work section, the total construction cost is calculated. When construction cost about an embankment and revetment is calculated, a unit cost adds a summery construction cost after being multiple with a quantity of representative work section. When calculating construction cost of a structure section, an informal unit cost corresponding to a site and a standard of each primary structure is multiples. |
申请公布号 |
KR20110021061(A) |
申请公布日期 |
2011.03.04 |
申请号 |
KR20090078634 |
申请日期 |
2009.08.25 |
申请人 |
INHA-INDUSTRY PARTNERSHIP INSTITUTE;DOHWA CONSULTING ENGINEERS CO., LTD. |
发明人 |
WOO, SUNG KWON;LEE, SI WOOK;PARK, SUNG HWAN;CHOI, JAE JOON |
分类号 |
G06Q50/06;G06Q50/08 |
主分类号 |
G06Q50/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|